Join Cycling UK to help us change lives and communities through cycling
Membership gives you peace of mind insurance, discounts in cycle shops, rides & routes – for just £4.00 a month!
ID | #58777 |
---|---|
Status | Fixed |
Location | TQ 38408 81053 |
Location Description | Bus signal |
Road Name | East India Dock Road, westbound, bus signal |
Hazard Type | Other |
Hazard Description | Bus priority signal on A13 East India Dock Road westbound at junction with Blackwall Tunnel northern approach ramp has an unacceptably long wait. Up until about 2 months ago the signal responded quite quickly; now it can take over 2 minutes to respond. Consequently, cyclists are bypassing the signal in the adjacent lane. For cyclists, this is quite hazardous / frightening. |
Approximate Size | N/A |
Approximate Depth | N/A |
Approximate distance from Kerb | N/A |
Date Encountered | 26 Jul 2011 |
Date Added | 26 Jul 2011 |
Planned Fix Date | Unknown |
Highway Authority | Transport for London |
District / Ward / Parish | Tower Hamlets / Blackwall and Cubitt Town |
Authority Reference | Unknown |
Cycling UK is a trading name of Cyclists’ Touring Club (CTC) a company limited by guarantee, registered in England no: 25185. Registered as a charity in England and Wales charity no: 1147607 and in Scotland charity no: sco42541. Registered office: Parklands, Railton Road, Guildford, Surrey GU2 9JX.
Contents © Cycling UK, all rights reserved.