Hazard #35149

DateEventByComments
18 Apr 2010 - 10:31AddedReporter
18 Apr 2010 - 13:32ReportedCTC
18 Apr 2010 - 22:41Reference addedHighway authorityHighway Authority reference updated.
27 Apr 2010 - 10:14CommentHighway authorityI refer to your e.mail reporting an area of broken road surfacing and a
pothole on the B977 Echt to Dunecht road at the entrance to Dunecht
adjacent to the 30 mph sign.

Arrangements are in hand for the matter to be investigated by our local
Roads Inspector. Repairs will be carried out as quickly as possible.

Thanks for raising the matter to our attention.
27 Apr 2010 - 19:49In progressReporterMajor carriageway works just started in and around Dunecht; should be good once finished but better avoided till work completed.
26 May 2010 - 19:57FixedReporterArea has been completely resurfaced and is now excellent
16 May 2013 - 11:17NotfixedReporterThe whole area of the B977 from the junction with the A944 up the hill to the junction with the track to Tillyfoddie is severely potholed.
16 May 2013 - 11:20ReportedCTC
17 May 2013 - 15:13Reference addedHighway authorityHighway Authority reference updated.
17 May 2013 - 15:13Reference addedHighway authorityHighway Authority reference updated.
17 May 2013 - 15:13Reference addedHighway authorityHighway Authority reference updated.
19 Jul 2013 - 20:41FixedReporterWhole stretch of road has been completely resurfaced. Excellent repair.
Join Cycling UK to help us change lives and communities through cycling
Membership gives you peace of mind insurance, discounts in cycle shops, rides & routes – for just £3.75 a month!