Join Cycling UK to help us change lives and communities through cycling
Membership gives you peace of mind insurance, discounts in cycle shops, rides & routes – for just £4.00 a month!
ID | #168238 |
---|---|
Status | Reported |
Location | ST 60663 77502 |
Location Description | The temporary ramp at the kerb at the start of the cycle path from Bonnington Road across the rugby fields |
Road Name | Bonnington Walk |
Hazard Type | Surface poorly restored after roadworks |
Hazard Description | The temporary ramp at the kerb at the start of the cycle path from Bonnington Road across the rugby fields is breaking up. Please could we have a proper dropped kerb installed? |
Approximate Size | 12 inches x 6ft |
Approximate Depth | n/a |
Approximate distance from Kerb | 0cm |
Date Encountered | 13 Sep 2019 |
Date Added | 13 Sep 2019 |
Planned Fix Date | Unknown |
Highway Authority | Bristol City Council |
District / Ward / Parish | Bristol, City of / Lockleaze |
Authority Reference | Unknown |
Cycling UK is a trading name of Cyclists’ Touring Club (CTC) a company limited by guarantee, registered in England no: 25185. Registered as a charity in England and Wales charity no: 1147607 and in Scotland charity no: sco42541. Registered office: Parklands, Railton Road, Guildford, Surrey GU2 9JX.
Contents © Cycling UK, all rights reserved.