Hampshire County Council
User Ratings
Speed of fixing hazards | 1.846155 | 13 votes |
---|---|---|
Quality of repairs | 1.923075 | 13 votes |
Condition of roads | 1.69231 | 13 votes |
To rate this highway authority, register with this site and log in.
Hazard Statistics
Total Hazards | 5,142 |
---|---|
Current Hazards | 4,156 |
Closed Hazards | 986 |
Fixed Hazards | 937 (18.40%) |
Contact Details
Web site | http://www.hants.gov.uk/ |
---|---|
Hazard reporting web page | http://www.hants.gov.uk/roadproblems.htm |
Hazard reporting telephone | 0845 6035633 |
Notes
Winchester is a HA?
Highways Defects generally fall into one of the following categories:
Emergency Defects – Defects which are considered to need urgent action are passed on to our contractors to be dealt with as emergencies. We endeavour to visit the site and make safe within 2 hours. In some cases this may involve the provision of cones and warning signs and the repairs being done later.
Normal Defects – Defects which are not emergencies are added to our contractors programme of repairs and we endeavour to deal with these within 2 months, where appropriate.
Complex Defects – Larger or more complex works (such as major resurfacing of roads or pavements) are generally programmed separately. These programmes of works have a long waiting list and schemes may have to wait some years until higher priority works are completed.
Minor Defects – Defects of this nature have been considered as very minor or not a high priority and no further action will be taken.