| ID | #8031 |
|---|---|
| Status | Reported |
| Location | SK 36034 85833 |
| Location Description | The lower half of East Bank Rd is all potholes and uneven surfaces, |
| Road Name | East Bank Road |
| Hazard Type | Unevenness due to rut or gully |
| Hazard Description | big patches of even surface near the kerb, every bump is felt on the bike and with no suspension on my road bike it feels like my front wheel is taking some damage. |
| Approximate Size | 100yard on a large strech of road |
| Approximate Depth | 2inches |
| Approximate distance from Kerb | 30cm |
| Date Encountered | 6 Aug 2007 |
| Date Added | 7 Aug 2007 |
| Planned Fix Date | Unknown |
| Highway Authority | Sheffield City Council |
| District / Ward / Parish | Sheffield / Park |
| Authority Reference | Unknown |
CTC – The UK’s National Cyclists’ Organisation
Since 1878 CTC has been protecting and promoting the rights of cyclists. We are a not-for-profit organisation that is funded through memberships and donations. We focus on the social side of cycling as well as being a powerful and independent voice on behalf of ALL cyclists. We offer a range of benefits for every type of cyclist. By joining us YOU are supporting UK cycling and giving us a louder voice on issues that are important to you.
Join & support us – 0844 736 8451
