| ID | #3544 |
|---|---|
| Status | Rejected |
| Location | SU 85611 68551 |
| Location Description | Doncastle road |
| Road Name | Doncastle road |
| Hazard Type | Surface poorly restored after roadworks |
| Hazard Description | raised tarmac |
| Approximate Size | 10ft X 2ft every 10 metres |
| Approximate Depth | 1 to 2 inches raised |
| Approximate distance from Kerb | from kerb outwards |
| Date Encountered | 7 Mar 2007 |
| Date Added | 7 Mar 2007 |
| Planned Fix Date | Unknown |
| Highway Authority | Bracknell Forest Borough Council |
| District / Ward / Parish | Bracknell Forest / Great Hollands North / Bracknell |
| Authority Reference | Unknown |
CTC – The UK’s National Cyclists’ Organisation
Since 1878 CTC has been protecting and promoting the rights of cyclists. We are a not-for-profit organisation that is funded through memberships and donations. We focus on the social side of cycling as well as being a powerful and independent voice on behalf of ALL cyclists. We offer a range of benefits for every type of cyclist. By joining us YOU are supporting UK cycling and giving us a louder voice on issues that are important to you.
Join & support us – 0844 736 8451
